Work to repair damage at Garrion Bridge has been completed much quicker than planned. The sections of road that were closed to complete the work have now reopened. Sandstone blocks which had fallen into the River Clyde were able to be retrieved and reused, which enabled both damaged sections of the bridge to be repaired […]
