Scottish Water is currently repairing a burst water main on Glasgow Road, Blantyre, outside number 295. This work will continue until Monday, January 19th. Residents may experience discolored water during and shortly after the repairs, but it will clear up if taps are left running for a while.
Tag: roadworks
Roadworks at Stonefield Crescent
A725 Ek Expressway Roadworks next week
M8 Roadworks due to Major Bridge Repairs
Amey, representing Transport Scotland, will start significant bridge works on the M8 on September 8, causing driver disruptions. The £9 million project involves upgrades to rail and slip roads at Junction 26 (Hillington Interchange) across five phases, with the first phase running until October 1. Traffic will be redirected via Braehead.
Muir Street Resurfaced
Utility work in High Blantyre’s Muir Street and Nursery Place has been completed, and the carriageway is fully resurfaced. This busy route, especially during school run times, is now ready for increased traffic due to the new housing estate on the former Kirkton Care Home site following the roadworks completion.
Roadworks at A727 East Kilbride Road
Improvement works will begin on A727 East Kilbride Road next week, with resurfacing scheduled for August 4-15. The road will be closed from Peel Road roundabout to East Renfrewshire boundary, with a marked diversion route in place. The aim is to minimize disruption during summer holidays and enhance road quality.
Welsh Drive Road Closure
Roadworks on M74 Southbound Sliproad
Essential repairs at Clyde Bridge, Motherwell will lead to a temporary closure of the southbound off slip at Junction 6 of the M74 and lane one of the A723 for four weeks from 20 July to 17 August. A signed diversion will direct traffic to Junction 7 and back. Night closures are scheduled for the setup.







