Overnight works are taking place on Blantyre Farm Road for the next 4 nights.
Starting tonight, 30th August 25 at 10pm through to 7am and again over the next 3 nights, Network Rail will be working to repair masonry on the bridge over the railway. Works include pointing with noise expected to be kept to a minimum.

